KEY FEATURES

High hammer energy

Hydraulic system

Stable crawler

Built for job sites
TECHNICAL SPECIFICATIONS
Hammer Energy
1200 Joules
Hammer Blows per Minute
570 – 1180 blows/min
Engine
Yanmar diesel engine
Engine Power
35.4 kW (47.5 HP)
Mast Height
5 metres
Machine Weight
Approx. 5,025 kg


ORTECO HD PRO 5m 1200J HYDRAULIC PILE DRIVER
The Orteco HD PRO 5m 1200J is a high-performance crawler-mounted pile driver designed for efficient installation of steel posts and foundation piles across solar farms, civil infrastructure and construction projects.
With 1200 Joules of hammer energy and a 5-metre mast, the HD PRO 1200J delivers strong driving power and reliable installation performance across a wide range of ground conditions.
The HD PRO 5m 1200J is a versatile heavy-duty pile driver engineered to deliver consistent performance on demanding construction sites.
Mounted on a crawler carrier, the machine offers excellent stability during pile driving while maintaining mobility across uneven terrain and large job sites. The hydraulic hammer system provides reliable driving force, allowing operators to install steel piles quickly and accurately.
The HD PRO 1200J is commonly used on renewable energy projects, civil infrastructure works and large-scale construction projects where high productivity and dependable performance are essential.
Typical Applications

Solar farm construction
Civil infrastructure projects
Road barrier and guardrail installation
Large-scale fencing projects
Foundation piling works

Contact
(02) 4415 9180
0400 365 575
Unit 19, 21 Kangoo Road
Somersby NSW 2250
PROJECT ENVIRONMENTS
The Orteco HD PRO 5m 1200J is designed for construction environments where reliable pile installation performance is essential.
It is widely used on solar farm developments and infrastructure projects where large numbers of steel piles must be installed efficiently across expansive sites.











